Main House Closet

Since the new electrical system is in the old one was removed out of the Main House Closet. Without it there anymore it was time for a facelift. The closet was gutted and it was determined that a sink could be installed since there was plumbing on the exposed wall of the CC for the OQ Bathroom. PEX lines were run through tha wall to the closet and a sink was installed. This was a much needed improvement since previously mop buckets were filled and emptied in the OQ Bathroom.

Project Status
January 12, 2009
VIEW PHOTOS
Pictures

<< BACK TO PROJECTS PAGE