Since the three upper addition rooms had to be gutted with the roof renovation it was time to start putting them back together. Since the siding wasnt completed yet we had to start in the middle to avoid water damage. The TMA was wired up, insulated, plywooded, and drywalled in one weekend. The next step was to get the room mudded and liveable by the time B section moved in and that goal was completed. Carpet was installed and the TMA is still a 4 person room with more space then before due to the eliminited, oversized closet.

Project Status
August 30, 2009